Following on from her previous post about why stainless steel deserves a leading role in the UK HVAC market, Amy Sedgwick here offers more – and bigger – reasons worthy of consideration by specifiers and contractors of commercial plumbing and HVAC systems…
Press systems in stainless steel up to 108mm have been established within the UK commercial marketplace for a number of years now, but what are the options for installations above this size?
Areas such as large scale plant rooms have standardised on stainless steel due to requirements for long service life and the ability to cope with challenging atmospheric conditions. In fact, a large proportion of projects switch to welding for sizes above 108mm.
However, there is now a choice thanks to our latest stainless steel press fittings innovation (and a UK first!) which offers an extended range up to 163.8mm, enabling further installed cost benefits to be realised without compromising on system quality and performance.
Following on from my earlier consideration of the specific benefits of using Pegler Yorkshire’s 444 stainless steel range as part of a VSH XPress or VSH Tectite piping system, here are even more reasons to use press systems over alternative methods.
Ideal for on-site installation
The new sizes of press fitting are ideal for on-site installation, particularly if the building is already operational such as a hospital, school or prison. The ability to install without heat or flame significantly reduces the amount of requirements on-site for post-installation system observation, fire prevention equipment (including trained staff) and surface and finished good removal or protection.
Significant savings on installation costs
Although welding is a ‘tried and trusted’ method of installation, it is not without serious health and safety risks. HSE recommends cold jointing in BS 9999:2017 Code of practice for fire safety in the design, management and use of buildings. The main benefit of using VSH XPress at sizes above 108mm is the potential to make significant savings on the installation costs. There is no need to employ a specialist welder fitter, who may charge high hourly rates; there is no waiting time for welding equipment to reach temperature; areas which are tricky to weld (elbows, tees) are now easily installed; and there is no requirement for cooling time or additional observation after the jointing has been completed.
Improved health and safety
This is before we consider the potential safety hazards that come with welding – some installers suffer health problems as a result of breathing in welding fumes and can become more prone to life-threatening lung infections. Welding fume is also a classified carcinogen, particularly the fumes produced from welding stainless steel (http://www.hse.gov.uk/welding/illness.htm). The HSE actively promotes considering a cold jointing method above welding to remove the need for flame (http://www.hse.gov.uk/welding/fume-welding.htm).
Ideal for enclosed or smaller spaces
Although installations at these larger sizes tend to often be carried out by specialist off-site fabrication companies who operate out of large premises, it is worth noting that a press connection does not require increased ventilation or open space like welding does which makes it the perfect choice for installing within enclosed spaces or smaller areas.
Improved pipework integrity
The high temperatures applied during the welding process forces the stainless steel to undergo a series of changes which could ultimately have an impact on the structure of the material, and make it susceptible to corrosion in areas of high stress such as joints, corners or poorly finished welds. Good corrosion resistance is not just a critical factor for the lifespan of a piping system, but is also of paramount importance in areas where the pipework regularly hits high temperatures as this exposure can accelerate the corrosion process. Examples of regular high temperature use would be in hygienic environments where pipework is regularly purged for thermal disinfection purposes.
Reduced post installation processes
Welding stainless steel may also require additional post welding processes to be carried out to ensure integrity of the weld and to restore the corrosion resistant layer. This can take the form of pickling baths, pastes and gels, and then potentially an additional process called ‘re-passivisation’ which can also be done through baths, pastes and gels. Both of these processes (if required) require additional time, controlled observation, specialist knowledge and application of dangerous chemicals which presents additional health and safety risks to the installation. After installation has been completed, there will be less flushing time required with a press system as no adhesives or additional products will have been added to the system. A press system is also proven to operate very efficiently with low pressure losses and flow resistance, due to the smooth bore that such a system offers.
Pegler Yorkshire’s XPress press system is WRAS approved and warrantied for up to 25 years with a choice of o rings making it suitable for a wide range of applications. It is available from major UK merchants.
ENDS
exciting challenges ahead for a young and ambitious individual
Pegler goes the extra mile to create a sustainable future and business
The benefits of the whole VSH Tectite range and its heat free jointing, cement its market leading status as a metal push-fit system in the UK
Health and safety is something that has been at the root of operations since the very beginning at Pegler and so we are holding a health and safety week to maintain traction
Contractors are frequently asked to deliver work faster and more cost-effectively than ever before. Removing the risk of squeezed margins while at the same time delivering on time and on budget can be achieved by working closely with building products manufacturers such as Pegler who can support contractors to deliver projects faster, safely and profitably.
It’s been a turbulent few years for British businesses. Some huge names have disappeared from the high street and the next 12 months won’t be any easier for companies, whatever their industry.
At Pegler, we pride ourselves on our reputation for quality and innovation in an industry where product reliability and versatility is demanded. Our jointing solutions span the full range from the tried and trusted traditional to the newer modern methods such as push and press.
Pegler is delighted to announce that we have joined the leading Yorkshire manufacturing and engineering membership group Made in Yorkshire.
Social media is often under the spotlight for the negative things that can happen on Twitter, Facebook and Instagram. But sometimes it can be a force for good too.
Designers and installers of pipe-work systems, whether they are for domestic, commercial or industrial projects, are facing increasing pressure to deliver more cost-effective solutions which optimise performance and conform to exacting quality standards.
As part of our commitment to our local community, we’ve been supporting a number of initiatives designed to help young people make their way in the business world.
By Amy Sedgwick, Market Manager – Press Systems, Pegler Yorkshire.
As part of Pegler Yorkshire’s community
engagement activities, Farah Yasin from the Marketing Department went back to
school to help out with this year’s TEKK Challenge. Here she describes how the
10-week programme has helped pupils get to grips with science, technology,
engineering and maths skills…
As a specifier or contractor of commercial plumbing
and HVAC systems you are probably already familiar with the benefits of using
stainless steel pipework systems.
As a manufacturer, we know only too well
the truth of the saying “you’re only as good as your last performance”. Our
customers (and their customers) judge us on their most recent experience of our
heating and plumbing solutions, which is one of the reasons we are continually
evolving our ranges, as well as our processes, to make sure we provide the very
best products and services.
Clive Gill, Technical Information Administrator, has been responsible for managing the processes we use to share product data with our customers for over 10 years. He shared his experience of getting to grips with Building Information Modelling (BIM) at last year’s Bathroom Manufacturers Association (BMA) BIM Workshop which took place just before its annual Bathroom and Kitchen Business Conference.
Well over half the work being carried out by heating engineers and contractors is on “live” sites, where traditional jointing methods can add extra workload in terms of paperwork and meeting health and safety requirements. Switching to modern press-fit jointing methods minimises on-site risks and means contractors can get on with the job in hand safely and quickly.